Qustions 1:
A change control system should include all the following except-

a.Procedures for automatic approval of defined categories of change
b. Paperwork, tracking systems, and approval levels necessary for authorizing changes
c. A description of the powers and responsibilities of the change control board
d. Procedures for conducting a midproject control system review

Qustions 3:

Two fundamental objectives of project control are to--

a. Alter activities to achieve results and manage organizational assets
b. Eliminate unexpected technical problems and identify technical difficulties that require more resources
c. Ensure that resources are available when needed and avoid increases in the scope of work
d. Have the required material, personnel, and equipment available when needed and ensure that budgeting is adequate

Qustions 5:

The project plan is important in change control because it--

a.Provides the baseline against which changes are managed
b. Provides the information on project performance
c. Alerts the project team to issues that may cause problems in the future
d. Is expected to change throughout the project

Qustions 2:
Written changes orders should be required on --

a. All projects, large and small
b. Large projects
c. Projects with a formal configuration management system in place
d. Projects for which the cost of a change control system can be justified

Qustions 4:

The principal sources of project failure are-


a. Lack of a projectized or strong matrix structure, poor scope definition, and lack of a project plan
b. Lack of commitment or support by top management, disharmony on the project team, and lack of leadership by the project manager
c. Poorly identified customer needs, a geographically dispersed project team, and little communication with the customer until the project is delivered
d. Organizational factors, poorly identified customer needs, inadequately specified project requirements, and poor planning and control

Qustions 6:

Interface management is --

a.Considered to be one of the easier aspects of implementing the project plan
b.Primarily concerned with the technical issues associated with linking system components in a configuration
c.Facilitated by use of the WBS to display the ways people on the project interact and their duties and responsibilities
d.The process of coordinating the various elements of the project so that they meet their joint goals of performance, schedule, and budget

下一篇:砺志PMP模拟题本周精选10

Qustions 1:
The output of scope change control consists of--

a.Scope changes, corrective action, and lessons learned
b. Corrective action, scope changes, and project plan updates
c. Performance measurement, additional planning, and lessons learned
d. Work results, product documentation, and formal acceptance

Qustions 3:

The scope statement--

a. Dose not include project objectives such as cost, schedule, or qual...[查看详情]

  影视动画培训   北大BEC培训官方报名网站   2008美国夏令营启航官方指定报名网站   2008留学第一站!  
  北师大 火星时代
共举影视动画培训之鼎
  北大BEC培训官方报名网站
现在报名独享95折!
  2008年国家职业资格考试
一次过关完全备考手册
  2008留学第一站
留学资讯尽在精英留学站!
 
上一篇:砺志PMP模拟题本周精选12
下一篇:砺志PMP模拟题本周精选10
 相关新闻
·PMI-PMPExamTipsandNotes8·PMI-PMPExamTipsandNotes9
·PMI-PMPExamTipsandNotes10·PMP美国项目管理认证考试模拟题精选6
·PMP美国项目管理认证模拟题精选7·PMP美国项目管理模拟题精选8
·PMP美国项目管理认证考试的模拟题精选10·砺志PMP模拟题每周精选1
·砺志PMP模拟题每周精选2·砺志PMP模拟题每周精选3
·砺志PMP模拟题每周精选4·砺志PMP模拟题每周精选5
·砺志PMP模拟题本周精选7·砺志PMP模拟题每周精选8
·砺志PMP模拟题本周精选9·砺志PMP模拟题本周精选10
 
◇ 重点栏目导航
◇ 精英服务承诺
教育顾问:010-51660910
QQ交流:138660910
相关资料
·2007年CPA考试《税法》讲义
·2008年10月自考笔记之《古代文学史一》(
·2008年10月自考笔记之《古代文学史一》(
·2008年10月自考笔记之《金融法》三
·2008年10月自考笔记之《金融法》二
·2008年10月自考笔记之《金融法》一
·新托福听力考试文化背景资料下载
·2008年1月至3月新托福考试口语资料整合
·北京大学2008年高考招生计划(医学)
·北京大学2008年高考招生计划(文科)
相关试题
·PMP模拟题精选10
·PMP模拟题精选9
·PMP模拟题精选8
·PMP模拟题精选7
·PMP模拟题精选6
·PMP模拟题精选5
·PMP模拟题精选5
·PMP模拟题精选4
·PMP模拟题精选3
·PMP模拟题精选2
相关热贴
·CGA入学条件及方法
·2007年度注册设备监理师执业资格考试报考
·上海紧缺人才岗位资格证书--AUTC现代物流
·教师资格考试心理学题库
·新托业考试面世,各媒体广泛关注
·监理考试读书心得--经验之谈
·2007年度注册资产评估师执业资格考试时间
·全国监理工程师执业资格考试大纲(2007)
·社会上的证书太多了,到底有没有作用呀?
·2007年度注册资产评估师执业资格考试报考