您的位置: 首页 >> 新闻中心 >> 职业认证 >> 项目管理师
砺志PMP模拟题本周精选13
■ 最新课程推荐更多课程>>
学校培训课程开课时间上课地点精英价报名
新 东 方 PMP考前辅导课程串讲滚动开班远程课堂¥1568
新 东 方 PMP考前辅导习题讲解滚动开班远程课堂¥686
北京华图 公务员面试实战突破班一2009-01学院路周边大¥2880
倚天机构 高级纳税筹划师认证培训电话预约西直门¥3800
北广之星 影视短片制作初级培训班电话预约中国传媒大学¥3500
Qustions 1:
You are in charge of developing a new product for a bank. Your quality metrics are based on the 80th percentile of each of the last three products developed. This is an example of:

a.Statistical sampling
b. Metrics
c. Benchmarking
d. Operational definitions

Qustions 3:

Scoring models, comparative approaches and benefit contribution are all part of:

a. Constrained optimization models for selecting a project
b. Benefit measurement models for selecting a project
c. Quality measurement techniques
d. Information distribution tools

Qustions 5:

Which of the following models of conflict resolution allows a cooling off period, but seldom resolves the issue in the long term?

a.Problem solving
b. Withdrawal
c. Forcing
d. Smoothing

Qustions 2:
The two closing procedures are called:

a. Contract close out and scope verification
b. Contract close out and administrative closure
c. Project closure and product verification
d. Project closure and lessons learned

Qustions 4:

During the schedule development process the Project Manager may have to go through several iterations of the schedule before establishing the schedule baseline. All of the following are tools and techniques that may be used during this process:

a. Critical Path Method, GERT, Resource Requirements
b. Resource Leveling Heuristics, Mathematical Analysis, Calendars
c. Duration compression, Resource Leveling Heuristics, PERT
d. GERT, PERT, Leads and Lags

Qustions 6:

The “To Complete Performance Index” (TCPI) is calculated by:

a.Subtracting the actual costs to date from the estimate at completion
b.Dividing the budgeted cost of the remaining work by the difference between the estimate at completion and actual costs to date
c.Multiplying the estimate at completion by the cumulative cost performance index
d.Adding the estimate at completion to the actual costs to date and multiplying by the cumulative cost performance index

下一篇:砺志PMP模拟题本周精选12

Qustions 1:
A change control system should include all the following except-

a.Procedures for automatic approval of defined categories of change
b. Paperwork, tracking systems, and approval levels necessary for authorizing changes
c. A description of the powers and responsibilities of the change control board
d. Procedures for conducting a midproject control system review

Qustions 3:

Two fundamental objectives of proj...[查看详情]

  影视动画培训   北大BEC培训官方报名网站   2008美国夏令营启航官方指定报名网站   2008留学第一站!  
  北师大 火星时代
共举影视动画培训之鼎
  北大BEC培训官方报名网站
现在报名独享95折!
  2008年国家职业资格考试
一次过关完全备考手册
  2008留学第一站
留学资讯尽在精英留学站!
 
上一篇:砺志PMP模拟题本周精选14
下一篇:砺志PMP模拟题本周精选12
 相关新闻
·PMI-PMPExamTipsandNotes10·PMP美国项目管理认证考试模拟题精选6
·PMP美国项目管理认证模拟题精选7·PMP美国项目管理模拟题精选8
·PMP美国项目管理认证考试的模拟题精选10·砺志PMP模拟题每周精选1
·砺志PMP模拟题每周精选2·砺志PMP模拟题每周精选3
·砺志PMP模拟题每周精选4·砺志PMP模拟题每周精选5
·砺志PMP模拟题本周精选7·砺志PMP模拟题每周精选8
·砺志PMP模拟题本周精选9·砺志PMP模拟题本周精选10
·砺志PMP模拟题本周精选11·砺志PMP模拟题本周精选12
 
◇ 重点栏目导航
◇ 精英服务承诺
教育顾问:010-51660910
QQ交流:138660910
相关资料
·2007年CPA考试《税法》讲义
·2008年10月自考笔记之《古代文学史一》(
·2008年10月自考笔记之《古代文学史一》(
·2008年10月自考笔记之《金融法》三
·2008年10月自考笔记之《金融法》二
·2008年10月自考笔记之《金融法》一
·新托福听力考试文化背景资料下载
·2008年1月至3月新托福考试口语资料整合
·北京大学2008年高考招生计划(医学)
·北京大学2008年高考招生计划(文科)
相关试题
·PMP模拟题精选10
·PMP模拟题精选9
·PMP模拟题精选8
·PMP模拟题精选7
·PMP模拟题精选6
·PMP模拟题精选5
·PMP模拟题精选5
·PMP模拟题精选4
·PMP模拟题精选3
·PMP模拟题精选2
相关热贴
·CGA入学条件及方法
·2007年度注册设备监理师执业资格考试报考
·上海紧缺人才岗位资格证书--AUTC现代物流
·教师资格考试心理学题库
·新托业考试面世,各媒体广泛关注
·监理考试读书心得--经验之谈
·2007年度注册资产评估师执业资格考试时间
·全国监理工程师执业资格考试大纲(2007)
·社会上的证书太多了,到底有没有作用呀?
·2007年度注册资产评估师执业资格考试报考