 Qustions 1: 
A project is an ideal environment in which to use the technique of management by objectives because-- 

a. Project management involves setting organizational objectives 
b. Projects generally are handled through a matrix management environment 
c. Project managers’ responsibilities are defined in terms of corporate objectives 
d. All projects should be strongly oriented toward goals and objectives 

Qustions 3:

All the following are examples of benefit measurement methods of project selection except--

a.  Benefit-cost ration 
b. Payback period 
c. Peer review 
d. Multiobjective programming 

Qustions 5:

Which of the followin

is a tool or technique used for project initiation--

a. Alternatives identification 
b. Configuration management 
c. Decision models 
d. Decomposition 

Qustions 2: 
Each project phase is marked by completion of one or more deliverables. The deliverable for the concept phase of a project is the-- 

a. Project plan 
b. Statement of work 
c. Project charter 
d. Resource spreadsheet 

Qustions 4:

Change requests may result from--

a. A review of the project charter 
b. A review of the performing organization’s strategic plan 
c. Enhanced problem-solving skills on the part of the project team 
d. An error or omission in scope  definition 

Qustions 6:

The project’s scope change control system is -- 

a. A collection of formal, documented procedures to define the steps by which official project documents may be changed 
b. A documented process used to apply technical and administrative direction and surveillance to identify and document functional and physical characteristics of items, record and report change, control change, and audit the items and system to verify conformance to requirements 
c. A set of procedures by which project scope may be changed, including the paperwork, trackingsystems, and approval levels necessary for authorizing change 
d. Mandatory for use on projects so that the scope management plan cannot be changed without prior review and sign-off

下一篇:PMP美国项目管理认证考试模拟题精选6

 Qustions 1: 
Which statement about customer expectations is not true -- 

a. The product or service should be usable as intended. 
b. Contractual provisions, including schedule and performance standards, should be met. 
c. Changes should be made immediately, and all customer wants should be satisfied without bureaucratic hassle 
d. The seller should assume the responsibility of understanding custom...[查看详情]

  影视动画培训   北大BEC培训官方报名网站   2008美国夏令营启航官方指定报名网站   2008留学第一站!  
  北师大 火星时代
共举影视动画培训之鼎
  北大BEC培训官方报名网站
现在报名独享95折!
  2008年国家职业资格考试
一次过关完全备考手册
  2008留学第一站
留学资讯尽在精英留学站!
 
上一篇:PMP美国项目管理模拟题精选8
下一篇:PMP美国项目管理认证考试模拟题精选6
 相关新闻
·PMP考试样题1(中文)·项目管理:PMP模拟题精选2
·项目管理:PMP模拟题精选3·项目管理:PMP模拟题精选4
·项目管理:PMP模拟题精选5·PMI-PMPExamTipsandNotes
·PMI-PMPExamTipsandNotes2·PMI-PMPExamTipsandNotes3
·PMI-PMPExamTipsandNotes4·PMI-PMPExamTipsandNotes5
·PMI-PMPExamTipsandNotes6·PMI-PMPExamTipsandNotes7
·PMI-PMPExamTipsandNotes8·PMI-PMPExamTipsandNotes9
·PMI-PMPExamTipsandNotes10·PMP美国项目管理认证考试模拟题精选6
 
◇ 重点栏目导航
◇ 精英服务承诺
教育顾问:010-51660910
QQ交流:138660910
相关资料
·2007年CPA考试《税法》讲义
·2008年10月自考笔记之《古代文学史一》(
·2008年10月自考笔记之《古代文学史一》(
·2008年10月自考笔记之《金融法》三
·2008年10月自考笔记之《金融法》二
·2008年10月自考笔记之《金融法》一
·新托福听力考试文化背景资料下载
·2008年1月至3月新托福考试口语资料整合
·北京大学2008年高考招生计划(医学)
·北京大学2008年高考招生计划(文科)
相关试题
·PMP模拟题精选10
·PMP模拟题精选9
·PMP模拟题精选8
·PMP模拟题精选7
·PMP模拟题精选6
·PMP模拟题精选5
·PMP模拟题精选5
·PMP模拟题精选4
·PMP模拟题精选3
·PMP模拟题精选2
相关热贴
·CGA入学条件及方法
·2007年度注册设备监理师执业资格考试报考
·上海紧缺人才岗位资格证书--AUTC现代物流
·教师资格考试心理学题库
·新托业考试面世,各媒体广泛关注
·监理考试读书心得--经验之谈
·2007年度注册资产评估师执业资格考试时间
·全国监理工程师执业资格考试大纲(2007)
·社会上的证书太多了,到底有没有作用呀?
·2007年度注册资产评估师执业资格考试报考